Search This Blog

Showing posts with label VW beetle IRS. Show all posts
Showing posts with label VW beetle IRS. Show all posts

Tuesday, 21 January 2020

Update Jan 21st 2020

Happy New Year!! I'm now back on the car after a nice long break over Christmas. There are a lot of smaller jobs to finish off before I get stuck into the electricals.

Body Fix (did this work in Dec 2019)

The body is fixed by a number of bolts down both sides of the car, as well as a number on the subframe. The side fixing points need to be drilled out from under the car and it was quite an awkward job, a four point lift would have made the job much easier.

Side mounts

Rear subframe


Rear cross frame


Oil Cooler & Oil filter

The pipework connecting  the oil cooler and oil filter to the engine was mocked up using cheap flexible pipe, using these as a template I had the final oil pipes manufactured from really nice and much more expensive material.




Once the tinware on the engine was in place, and it didn't originally fit, taking a few hours of filing and adjustment to get it all on, I did a dummy fit on the tray that sits below the engine. I needed to get this in place before I did a final fix in position of the oil cooler pipes and as expected it didn't fit and needed some "adjustment".

Final piece of tinware fitted and lower engine tray clamped in place prior to adjustment

Once "adjusted I did the final fit of the tray using a seal from a T25 Van rather than the seal supplied which being much smaller and more rigid didn't give the final seal that I wanted. All fits well,  but I have removed it to give me better access to the engine bay for fitting the fuel pipes and wiring.

Van seal on the left original seal on the right

The oil pipes and filter assemblies were fitted to the subframe by drilling out and fixing using Rivnut fitting,

Oil filter mounted onto rear subframe

Final Fix of the coil pack

I had to adjust the original bracket to lift the coil back away from the engine tray. Once modified I painted it black to match the coil pack.
Before adjustment




After adjustment





Wiring Loom

I have started to pull the wiring loom through the car.I going to have to add additional working on for a number of items, this list may grow, but for now its as below:
  • Heated seats
  • Music
  • Immobiliser
  • USB chargers
  • Electric heater






Sunday, 31 March 2019

Update March 31st 2019

IRS Suspension


I  decided earlier in the project to fit adjustable plates, providing me with the ability to adjust the ride height without having take apart all the rear suspension, however when I came to fit these, they didn't fit, after much head scratching and self doubt, I found out that this wasn't uncommon, so had to drill them out.


The torsion bars were fitted with upgraded urethane mounts. Lots of tugging and heaving but all fitted.

Pedals and cables

All the pedal assembly and cables have been fitted. I might come back to the accelerator pedal as  I don't like the look of the EMPI covers.

Brake pipes

All brake pipes have been fitted quite a nice job to do. Not filled the system yet but have decided to use DOT 5 silicone based fluid that doesn't take up water so lasts a long time, reduces component degradation and doesn't damage paintwork, lots of upsides, downside is the price...ouch!


Other jobs completed

  • Fitted new bush and starter motor
  • Fitted both drive shafts, packing with grease has got to be one of the messiest jobs ever.
  • Final fix on shock absorbers
  • Fitted rear sway bar, which was really easy to fit.